Week 8: June 21-25
So I didn't get a chance to take pictures for last week, Week 8. In Week 8 the floors were done. This included new wood floors in the kitchen, patching the floors where walls were taken down, and then completely refinishing the floors throughout the house. The only room upstairs without wood floors in the bathroom. The floors were covered over before I could get pictures taken.
Week 9: June 28-July 2
The beginning of the week the floors had the finish put on. We had to take the cats out of the house for a few days as the finish smells. Genie and Lonnie graciously took in the cats until we could allow them back into the house on Wednesday evening.
The cabinets arrived on June 30th and installation began. There are a few issues with missing pieces and incorrect sizes, but hopefully these will be resolved without delaying the project. So far the cabinets look great and I'm excited to have the appliances put into place. We bought the appliances back in March and they have been sitting down in the garage patiently waiting to come upstairs.
The bathroom tile has been installed. The work on the bathtub/shower tile started in week 8 and was finished in week 9. The floor was tiled in week 9. Still needs to be grouted, but all the tile is laid and looks amazing. The tile installer suggested we do the fireplace as well while he is working at the house. Having the fireplace re-done has been on my list for years, so I ran over to the tile store and figured out a pattern and picked out tile. The fireplace tile should arrive on July 16th for installation. We'll also have a new mantle and molding installed.
Week 10 is a short week since Monday, July 5th is a holiday. Hopefully the windows will make their appearance this week. The windows were ordered back in the first half of May, and we've been eager for them to arrive. Also, the countertops should be patterned this week for installation in Week 11.
Per our contractor, it seems that the estimated 12 week project will end up being a 13 or 14 week project. Aside from finishing the cabinet installation, window installation, and countertops, there is the kichen tile backsplash, the under-cabinet lighting, the kitchen hood and dishwasher to install, the painting, the interior doors to install and finish carpentry.